> **Galexis opens its modernised logistics site in French-speaking Switzerland - Galenica.com**

> After around 40 months of construction, Galexis opens the modernised distribution centre in Lausanne-Ecublens.

- Language: en
- Last Modified: 2024-04-05
- Source: <https://www.galenica.com/en/news/entries/2022-09-07_avance_news.php>
- Alternate (fr): <https://www.galenica.com/fr/news/entries/2022-09-07_avance_news.php>
- Alternate (de): <https://www.galenica.com/de/news/entries/2022-09-07_avance_news.php>
- Search: <https://www.galenica.com/en/search/index.php?searchTerm={search_term_string}>

---

![Thumbnail for article: Galexis opens its modernised logistics site in French-speaking Switzerland](https://www.galenica.com/galenica23Assets/img/medien/news/weblication/wThumbnails/12ba7773-2c26-41e7-bdc3-2424a4de0e41-63c7cefe-4ae1949f@1500w.jpeg)

News 2022/09/08

## Galexis opens its modernised logistics site in French-speaking Switzerland

After around 40 months of construction, Galexis opens the modernised distribution centre in Lausanne-Ecublens.

Galexis is the leading Swiss pharmaceutical wholesaler. After the distribution centre in Niederbipp (BE), the modernised logistics site in Lausanne-Ecublens is the second-largest location and the hub for the supply of medications in French-speaking Switzerland. Galexis has operated the distribution centre in Lausanne-Ecublens since the early 1970s. With the modernisation, Galexis is not only investing in the safety and supply of medicines to the population of French-speaking Switzerland, but is also clearly demonstrating its commitment to the location in French-speaking Switzerland.

### State-of-the-art technology increases efficiency

The roof of the storage area was raised by 2.8 metres, bringing the hall’s interior volume to a capacity of 10,000 m3. A new automated order picking system was installed inside the distribution centre. This increases the degree of automation from under 30% to around 70%, while throughput increases to 30%.

Up to 100,000 packs can be shipped every day in the modernised distribution centre.

### Investments in sustainable energy concepts

In the course of the modernisation, a completely new building envelope was created that is state-of-the-art in terms of energy efficiency. In addition, a 300 m2 photovoltaic system was installed on the roof of the building, which will contribute a significant proportion of the building’s energy requirements. The photovoltaic system has an output of 50 kWp and saves 16.5 tonnes of CO2 per year, which is equivalent to planting around 600 trees.

This makes the Lausanne-Ecublens site the first to be modernised in line with the latest energy concepts of the Galenica Group. The location makes a major contribution to achieving the sustainability goals of the entire Group.

Galenica invested around CHF 34 million in the modernisation of the distribution centre in Lausanne-Ecublens, as well as a further CHF 5 million in project planning, temporary measures and demolition.

[Factsheet 317,62 KB](https://www.galenica.com/galenica23Assets/bin/de/news/220905_factsheet-medien_e.pdf)

Share post:

[back](https://www.galenica.com/en/storyhub/index.php)

## You might also be interested in this

Press releases

2026/11/18

#### Verfora acquires majority stake in distribution partner Qpharma

With Qpharma, Verfora is gaining an established Polish pharmaceutical distributor with a strong distribution platform in Central and Eastern Europe.

[Verfora acquires majority stake in distribution partner Qpharma](https://www.galenica.com/en/storyhub/eqs/86792312-b676-44cf-85a8-3274a5ad078e.php)

Press releases

2026/10/26

#### Galenica successfully places a bond of over CHF 200 million

Today, Galenica successfully placed a fixed rate bond of over CHF 200 million. The bond has a term of 4 years and an annual coupon of 1.2775%.

[Galenica successfully places a bond of over CHF 200 million](https://www.galenica.com/en/storyhub/eqs/216bfdff-51da-47a5-b9fd-a0fb4222acf2.php)

Ad hoc announcements

2026/10/22

#### Galenica continues growth trajectory and confirms outlook for 2026

Galenica increases sales by 5.7% to CHF 3,172.0 million in the first nine months of 2026. The pharmacy business and home care are key contributors to growth.

[Galenica continues growth trajectory and confirms outlook for 2026](https://www.galenica.com/en/storyhub/eqs/75d2d9ff-4b40-4a24-8f9a-71d7d8e85670.php)

2026/09/17

#### Five football pitches full of medication – and one system for emergencies

Millions of packs of medicines are stored in Burgdorf. Some of them are intended for the moment when the market can no longer guarantee supply. How this compulsory stock works and is drawn upon, why it is far from being a dusty emergency reserve, and what role the Galenica network company Alloga plays in supplying Switzerland.

[Five football pitches full of medication – and one system for emergencies](https://www.galenica.com/en/news/entries/20260915-6827872869-news.php)

2026/09/01

#### A new gem joins the network: Galenica acquires Bären Apotheke am Zytglogge

The long-established Bären Apotheke am Zytglogge has been part of Bern’s cityscape for generations. Since 1 September 2026, it has been part of the Galenica network and continues to operate under the name “Bären Vita Zytglogge” with a new concept. This preserves a piece of Bern’s history while opening up new prospects for its future.

[A new gem joins the network: Galenica acquires Bären Apotheke am Zytglogge](https://www.galenica.com/en/news/entries/20260831-1530729059-news.php)

2026/08/31

#### Creating New Spaces in Harmony with Our Culture

The world of work is constantly evolving, and Galenica is evolving with it. As part of our transformation, we are actively shaping the future. This is reflected not only in the way we collaborate, but also in the environments in which we work.

[Creating New Spaces in Harmony with Our Culture](https://www.galenica.com/en/news/entries/20260828-4185621035-news.php)

Ad hoc announcements

2026/08/06

#### Galenica maintains its track record of consistent growth

Galenica increases sales by 7.1% to CHF 2,136.5 million in the first half of 2026. Adjusted<sup>1</sup> EBIT increases by 7.1% to CHF 117.7 million.

[Galenica maintains its track record of consistent growth](https://www.galenica.com/en/storyhub/eqs/56b03300-1d96-40ad-8ba5-2aa0e5bb109b.php)

2026/06/30

#### Change in the Executive Committee of Labor Team

Alain M. Cahen will step down as CEO of Labor Team at the end of June 2026 and will also leave the Executive Committee. COO Thomas Brinkmann will take over on an interim basis.

[Change in the Executive Committee of Labor Team](https://www.galenica.com/en/news/entries/20260630-1601920926-news.php)

Video

2026/06/18

#### Coordinated basic care: From pilot projects to system solutions

Collaboration between different healthcare providers is already being tested in numerous pilot projects. One recent example is the Baselland supply model, which also involves participation from pharmacies in the Galenica network. The task going forward is to develop these approaches systematically and translate them into sustainable, broad-based system solutions. Daniele Madonna, Chief Pharmacies Category Management & Health Services, called for this step at this year’s Healthcare Professionals Initiative on 5 June 2026.

[Coordinated basic care: From pilot projects to system solutions](https://www.galenica.com/en/news/entries/20260617-4349880772-news.php)

Video

2026/06/01

#### Sun Store Renens: First pharmacy in Western Switzerland to introduce the new concept

With the redesigned Sun Store pharmacy in Renens (VD), the first pharmacy in Western Switzerland is opening with a completely new concept. It places a strong focus on personalised advice, healthcare services and the overall customer experience. The aim is to further improve people’s access to low-threshold primary care services.

[Sun Store Renens: First pharmacy in Western Switzerland to introduce the new concept](https://www.galenica.com/en/news/entries/20260428-7147085906-news.php)